This chart can be used to show various types of data like:
Showing posts with label Team Tools. Show all posts
Showing posts with label Team Tools. Show all posts
Wednesday, June 13, 2018
Doughnut Pie Chart
WHAT
IS IT AND WHAT’S FOR?
Multi-level
Doughnut Pie Charts are a set of concentric circles which is used to visualize
hierarchical relationships. It allows you to show symmetrical and asymmetrical
tree structures in a consolidated pie-like structure.
Size of each item
represents its contribution to the inner parent category. It starts with a
single item that is put as a circle in the center. This is the root nod, a
concentric ring is set around this central circle to see the breakup of that
item. The concentric ring is then segmented to show how various child items
have contributed to the parent item.
This chart can be used to show various types of data like:
-
Multi-tiered data presentation
- Organization
structure
-
Inter-linked tree data
- Sales
breakup
- Many
Others…
Download Link:
Attendance Tracker Ver. 1.1
ATTENDANCE
TRACKER
Attendance List Control, always
helpful. It’s a Simple Tracker with tendency and graphical view.
Note: To modify "Locations" from Drop Lists go to “Master Data” Sheet and replace actual texts.
MAIN CHARACTERISTICS:
- Tendency Graph for attenders - Status Bar Chart Included
- Revision Date (Automatically updates with last Save Time Stamp)
- Visual Icons for each Status.
Download Link:
Open Issues List (OIL) Ver. 1.2
By Paco SalasJune 13, 2018Performance Measurement, Project Management Tools, Team Tools, Tracker
No comments:
WHY
AN OPEN ISSUES LIST (OIL) IS NECESSARY?
Simple Tracker that allows to record
and follow the progress of every problem or "Issue"
that user identifies until the problem is resolved.
Allows the management of their
priority and status to keep everyone on the team updated.
MAIN CHARACTERISTICS:
- Three
single status Drop list for tasks (Open, Closed & On Hold) and Priority
(Low, Normal & High)
- Bar Chart
to visualize Internal or Customer Open / Closed items.
- Issue
Tracker Graph with 1 to 4 Weeks visibility and priorities summary.
- Revision
date automatically updates based on last saved document date.
- Error
system Pokayoke for activities close status (If closed date it’s missing Yellow
triangle appears)
Download Link:



